Temporary repair and closure of bridge on Laskein Barato Road
The Executive Engineer of PWD (Roads) Shangpung Division, Shangpung, has informed that the temporary repair work for Bug Bridge No. 10/1 on Myntang River, located on Laskein Barato Road under the jurisdiction of Laskein Block, is scheduled to take place on June 10.
The bridge is currently in a weak and distressed condition, necessitating immediate attention.
The repair work will commence at 10:00 AM and is expected to continue until 5:00 PM. During this period, the bridge will remain closed and all vehicles will not be allowed to ply.
Leave a Reply